1 Scope The purpose of this report is to present the information concerning the use of IEC 60964. National committees have circulated a questionnaire (see Annex A) and answers from designers, safety authorities and vendors have been collected. The main topics of the questionnaire were: • Is IEC 60964 well known and part of a list of reference documents? • Has IEC 60964 been considered and/or implemented for a project (new plant or modernization)? • Has it been implemented fully or partly? • What have been the reasons for using or not using it? • Which other documents have been used? • What are the strong points and the weak points of the standard? After a short presentation in Clause 4, of the contents of IEC 60964 and other related standards, the answers to the questionnaire are summarized in Clause 5. Even if the observation time (twelve years) is limited recommendations to improve the standard are proposed in Clause 6 and Clause 7 is the conclusion. 2 Reference documents 2.1 Standards directly linked to IEC 60964 IEC 60964:1 989, Design for control rooms of nuclear power plants IEC 61 227:1 993, Nuclear power plants – Control rooms – Operator controls IEC 61 771 :1 995, Nuclear power plants – Main control room – Verification and validation of design IEC 61 772:1 995, Nuclear power plants – Main control room – Application of visual display units (VDU) IEC 61 839:2000, Nuclear power plants – Design of control rooms – Functional analysis and assignment IEC 62241 : Nuclear power plants – Main control room – Alarm functions and presentation (under consideration)
2.2 Other documents which are mentioned – IEC 60960, IEC 61 51 3, IEC 60980. – NUREG 0700, 071 1 , 5908, 3371 , 2623. – IAEA-TECDOC 565, 668, 81 2, 1 066. – EPRI NP 3659. – ISO 1 1 064, ISO 9241 . – KTA 3904. 3 Terms and definitions For the purposes of this document, the terms and definitions given in 1 .4 of IEC 60964 apply. 4 Reminder of the contents of IEC 60964 and related IEC standards 4.1 Contents of IEC 60964 – Design for control rooms of nuclear power plants The standard covers the following subjects: • Clause 2: Design principles for the main control room, including the functional design objectives, the safety, the availability, the human factors engineering and the utility operation principles. • Clause 3: Functional design of the main control room, including the function analysis, the assignment of functions, the verification and validation of the functional assignment and the job analysis. • Clause 4: Functional design specification, including the human capabilities and characteristics, the location, the space and configuration, the panel layout, the location aids, the information system, the controls and the communication system. • Clause 5: Verification and validation of the integrated control room system. 4.2 Contents of IEC 61 771 – Nuclear power plants – Main control room – Verification and validation of design The standard covers the following subjects: • Clause 4: Verification and validation of a new control room design, including design process, V&V activities, verification and validation of the function assignment and the integrated control room. • Clause 5: Verification and validation of the evolutionary designs and back fits, including the verification and validation of the function assignment and the integrated control room system.
4.3 Contents of IEC 61 772 – Nuclear power plants – Main control room – Application of visual display units (VDU) The standard covers the following subjects: • Clause 4: Design requirements, including the principal users, the failure criteria, the system capabilities, the information needs and application procedures. • Clause 5: Design and implementation of VDU formats, including the design, the general requirements and the form of presentation. • Clause 6: Methods of access to VDU-based information. • Clause 7: Verification. • Clause 8: Validation. 4.4 Contents of IEC 61 227 – Nuclear power plants – Control rooms – Operator controls The standard covers the following subjects: • Clause 4: Design, including the design principles, the types of control system interface, the selection of control system, the design requirements. • Clause 5: Consultation with operators and training. 4.5 Contents of IEC 61 839 – Nuclear power plants – Design of control rooms – Functional analysis and assignment The standard covers the following subjects: • Clause 4: Process of functional analysis and assignment. • Clause 5: Functional analysis. • Clause 6: Assignment of functions. 4.6 Contents of IEC 62241 – Nuclear power plants – Main control room – Alarm functions and presentation (under consideration) The standard covers the following subjects: • Clause 5: Basic functional requirements, including the alarm functions, the alarm signals, the alarm processing and the alarm presentation. • Clause 6: Design definition of alarms. • Clause 7: Alarm signal processing. • Clause 8: Alarm display processing. • Clause 9: Alarm control and management. • Clause 1 0: Alarm presentation and display control integration.
www.findfreestandards.com